Monday, April 29, 2013

Tracklaying Is Underway!

Progress continues on the new CB&Q in Wyoming, albeit a bit slowly.

A couple weeks ago I started laying track on the NP mainline on the side of the peninsula opposite the Laurel yard. The mainline track is code 83. The yard, when I get there, will be code 70. Not sure about the siding at Laurel yet, but I'm leaning towards 70 there as well.

About 15 feet of track is down, including some superelevated track around the end-of-peninsula curve that will skirt the roundhouse.

As you can see from the shot just below, lots more stuff I need it for construction is winding up on the table. I'm short on work table area, so it winds up on future ROW for now:


Here's a close-up of the loco on the curve, showing the superelevation in the loco's inwards tilt:


I've borrowed a set of Fast Tracks #8 turnout jigs from a friend, and will soon be building the mainline turnouts that will go into Laurel yard. The first of these is necessary before much more in the way of track can be laid.

No comments: