Well, I've made progress on the last set of detectors for Minneapolis staging, but they're not done yet. They're mounted and the main cable, which arrived last Wednesday, is strung between the panel and the detector area. The cable is tied in to the control panel itself, but LEDs are not installed yet.
I'm hoping I'll have the installation finished by the end of this weekend, but with the holidays and borough business meetings and such, I'm not sure it'll happen that fast.
I just realized I never posted results of the election. I won, by three votes. I'll be sworn in on January 3rd.
Welcome to the Construction Blog for The CB&Q in Wyoming! Here I'll update, on a more frequent basis than on my website (http://www.thecbandqinwyoming.com) construction of my layout.
About Me
- Mark B.
- Allendale, SC
- I grew up in Wyoming, mostly living in areas served by the railroads I model. I remember standing at the window in our Cody Wyoming home, staring at night at the old Husky refinery across town. I remember the bridge across the creek and under the tracks between Powell and Cody. I remember always looking for trains as we travelled through the Wind River Canyon. And I remember my mother's last home - a mobile home in Evansville next to the Burlington mainline.
No comments:
Post a Comment