I've managed to start doing some work on the layout this past week. I'm in the process of installing occupancy detectors in the center of the Minneapolis staging yard. All the detectors are mounted and connecting wires attached - now I just have to connect the wires to the cabling, the cabling to the panel, and install the LEDs in the panel. In all, probably seven or eight hours of work to go to get this batch functional.
Then it's on to the set of detectors at the far end of Minneapolis. Total that will take about ten hours, then I can install the Thermopolis base support, run track into Thermopolis, add fascia board to the Glenrock area, then FINALLY start installing basic scenery at Glenrock. Hopefully I'll have some time over the Christmas break to do some of that.
Welcome to the Construction Blog for The CB&Q in Wyoming! Here I'll update, on a more frequent basis than on my website (http://www.thecbandqinwyoming.com) construction of my layout.
About Me
- Mark B.
- Allendale, SC
- I grew up in Wyoming, mostly living in areas served by the railroads I model. I remember standing at the window in our Cody Wyoming home, staring at night at the old Husky refinery across town. I remember the bridge across the creek and under the tracks between Powell and Cody. I remember always looking for trains as we travelled through the Wind River Canyon. And I remember my mother's last home - a mobile home in Evansville next to the Burlington mainline.
No comments:
Post a Comment