The switches and yard tracks for the Laurel yard throat near the locomotive facilities has been installed and wired.
I still need to install ground throws on the new turnouts, add the caboose track and complete the engine facility tracks (that's a long term project that will be done as the facilities are constructed). But the body tracks are functional at this point.
Welcome to the Construction Blog for The CB&Q in Wyoming! Here I'll update, on a more frequent basis than on my website (http://www.thecbandqinwyoming.com) construction of my layout.
About Me
- Mark B.
- Allendale, SC
- I grew up in Wyoming, mostly living in areas served by the railroads I model. I remember standing at the window in our Cody Wyoming home, staring at night at the old Husky refinery across town. I remember the bridge across the creek and under the tracks between Powell and Cody. I remember always looking for trains as we travelled through the Wind River Canyon. And I remember my mother's last home - a mobile home in Evansville next to the Burlington mainline.
No comments:
Post a Comment