It's been a couple of weeks since I last posted - anyone notice?
The control panel is just a few connections from finished - for now. Only five of the 24 total IRDOTs are wired into the panel, because I only have five installed. The others will come over the next six to eight months (these things are about $25 apiece, so I have to break the purchase into small numbers at a time).
Everything works - I just have to wire the IRDOT power supply through the panel off switch.
I'll be posting pics of the finished panel in a day or so.
Welcome to the Construction Blog for The CB&Q in Wyoming! Here I'll update, on a more frequent basis than on my website (http://www.thecbandqinwyoming.com) construction of my layout.
About Me
- Mark B.
- Allendale, SC
- I grew up in Wyoming, mostly living in areas served by the railroads I model. I remember standing at the window in our Cody Wyoming home, staring at night at the old Husky refinery across town. I remember the bridge across the creek and under the tracks between Powell and Cody. I remember always looking for trains as we travelled through the Wind River Canyon. And I remember my mother's last home - a mobile home in Evansville next to the Burlington mainline.
No comments:
Post a Comment