The new control panel is coming along slowly, but it IS progressing. I managed to get one bank of track selected indicators wired, and all the Tortoise switch wiring is complete. Here's a couple of shots of the panel as of Sunday night:
And here's a view of the face of the panel with one occupancy indicator temporarily powered:
Welcome to the Construction Blog for The CB&Q in Wyoming! Here I'll update, on a more frequent basis than on my website (http://www.thecbandqinwyoming.com) construction of my layout.
About Me
- Mark B.
- Allendale, SC
- I grew up in Wyoming, mostly living in areas served by the railroads I model. I remember standing at the window in our Cody Wyoming home, staring at night at the old Husky refinery across town. I remember the bridge across the creek and under the tracks between Powell and Cody. I remember always looking for trains as we travelled through the Wind River Canyon. And I remember my mother's last home - a mobile home in Evansville next to the Burlington mainline.
No comments:
Post a Comment